News
29th January 2010
Insulation work on SS Rotterdam finished
After a three year period, the biggest projec in the history of pinta Nieuwburg is completed. In total, more than 50,000 m² of firethermal and sound insulation work have been done as well as 36,000 m of hot and cold water pipelines and 7,000 m² of airducts were outfitted.
Facts about the ship:
- Length: 228 m
- Width: 28 m
- Height: 41 m above water
- Weight: 38,645 tons
- Capacity: 5,500 guests
- Facilities: 3 restaurants, 3 bars, 1 theatre, 289 rooms
- Open to public: 7 days a week
- Permanently based in Rotterdam
1st January 2009
pinta Nieuwburg has to moved to its new headquarters in Ridderkerk. Offices and production site are now under the same roof. Also, logistics from both the pinta Nieuwburg workshops in Ridderkerk and the former UNISOL workshop at Raamdonksveer are now more efficient.
Our new contact details are:
pinta Nieuwburg BV
Nikkelstraat 5a
2984 AM Ridderkerk
The Netherlands
phone +31 (0)180. 530 530
fax +31 (0)180. 511 841
archief@pinta-nieuwburg.nl
www.pinta-nieuwburg.nl
1st September 2008
Looked for and found: pinta enlarges and contributes to the success of the pinta Nieuwburg BV location with the acquisition of UNISOL
pinta elements does not grow just to grow – rather, every increase in size or every new location is intended to improve our work, optimize our processes, shorten our paths.
Against this background, we are very pleased to report the acquisition of the Dutch insulation company UNISOL BV. Together, we have started out on a course of expansion with complete confidence.
Both companies complement each other with their knowledge, their aims and their many years of experience – a basis that bodes well for the future as the consolidated pinta Nieuwburg BV.
For the employees at the Krimpen location, not much will change: Administration, planning and management will be completely integrated into pinta Nieuwburg BV. All important points of contact – both internal and external – are located on site.
From this location, we supply in particular customers and buyers from the ship building industry. With the most advanced noise control and insulation solutions for everything from private yachts to cargo ships. As we said: Size is secondary. More important is the maximum level of quality, convenience and safety.
To the future!
1st August 2008
pinta Nieuwburg has acquired a second flash cutting machine for its trade company that will be used for cutting gaskets and other rubber materials.
3rd October 2006
Nieuwburg has acquired a new flash cutting machine for its trade company that will be used for cutting gaskets and other rubber materials.
1st October 2006
Nieuwburg has acquired the company TISCOM, an insulation service company located in Antwerpes, Belgium. Alongside this acquisition Nieuwburg Belgium and TISCOM have been combined and are now located together in one office in Antwerpes, Belgium.
Through this acquisition there are now 10 employees covering the Dutch part of Belgium for Nieuwburg / TISCOM.
|